HeaterCraft Products LLC.
US MADE Polaris General OverHead Blowers By Inner Demon
Couldn't load pickup availability
Upgrade your rides with a Polaris General (2019 +) Overhead Blowers By Inner Demon Motor sports. Our US-made, one-piece plug and play system boasts dual 10" Spal Blowers. Enjoy industry-leading power and efficiency with ease.
What makes this an industry leading Overhead Blowers?
- IP 68 Dual 10 inch 802 CFM Spal blowers
- MAX CFM 1604!
- IP 68 Dual control lighted switches for each of the Blowers
- IP 68 lighted on/off switch for the lights
- One PCS 1/8" power coated aluminum frame
- Stainless hard ware
- Plug and Play wire connections to the pulse bar Only, Two crimp connections are required for main harness.
- Keyed powered with pulse bar connection.
- 3 year warranty
- 30 amp max amp draw
- Running amp draw of 15 amps
The kit will include the following
- Qty 1 Cyclone Overhead fan assembly with power disconnect
- Qty 1 Mounting Kit
- Qty 4 Over Profit cage clamps
- Qty 4 M6x55mm bolts
- Qty 4 rubber gasket washers
- Qty 4 stainless washers
- Qty 4 M6 nylock hex nuts
- Wiring harness
- Qty 1 40 amp dual fused IP68 relay with Pulse bar plug
- 8 Foot power harness to run inside (recommended) of the cage or the outside of the driver side A Pillar. One side with a power disconnect and the other side bar to make the final connections.
Tools required
- M10 driver/open end wrench /ratchet wrench with 10mm socket
- Phillips screw driver
- Wire terminal crimpers/strippers/cutters
Designed, Built and tested in The USA. For Riders by Riders
Installation
- Remove front section of the roof
- Route the 8 foot power wire through drive side A-Pilar and the dash into the front hood compartment area close to the pulse bar. The plug is for the fans and remains on the top side.
- Snap the Profit cage over brackets on to the machine from the out side in. They are tight and will flex/bend over a snap into place.
- when bolting down the over head to the bracket the sequence is
- Bolt
- gasket washer
- then through the Frame of the overhead
- through the bracket
- washer
- ny-lock nut
- Its best to have help holding the over into place as you get the first two bolts started
- DO NOT tighten the over head down until all four bolts are in place and the over head is square between the cage.
- Connect power plug to over head harness at the fans.
- Plug the relay assembly into the open pulse bar slot
- Mount the relay
- Trim power leads from the Overhead to length and connect
- BLACK to BLACK to the open connector
- RED (from long harness) Blue lead from the Relay
- Test over head and reassemble roof.
*Pictures are representation of the overhead blower assembly and may not represent the current version of the product.




